Landscape Contractor / Design Build Maintain

NOV 2014

LC/DBM provides landscape contractors with Educational, Imaginative and Practical information about their business, their employees, their machines and their projects.

Issue link: https://landscapecontractor.epubxp.com/i/407905

Contents of this Issue

Navigation

Page 15 of 55

Top: Impermeable geotextile liner and PVC pipes were installed below the aggregate to channel drainage into the storm water system. The aggregate consists of three layers of fractured washed open graded stone between the geotextile liner and the pavers, providing a filtration system to reduce contaminants from the water before it is released into the storm water system. Left: The existing sidewalk and red pavers remained unchanged through the project, which took a 5-person crew 30 days to complete. The addition of the aggregate and permeable pavers leveled Main Street from an eight percent to a two percent crown, which allows for proper drainage during both major and minor rain events. 16 LC DBM aesthetics. We installed 18,000 square-feet of permeable interlocking concrete pavement (PICP) from Pavestone for the designated angle parking areas between the street and sidewalks." Rocky Mountain Hardscapes, one of the largest commercial paver installers in the Col- orado market and an HNA award winner, was enlisted to complete the project. In addition to directing excessive rain and melted snow and ice to an under drain collection system, the zero infiltration PICP design has aggregate layers within the permeable paving section to act as a filter that reduces contaminants from the water before discharging into the storm water system. "We eliminated the eight percent crown on Main Street that was created by multiple overlays throughout the years, back down to the traditional two percent," said Curtis. "The pavers allow for proper drainage in smaller rain events without the need for multiple inlets. Smaller rain events never get runoff to the gutter. As well, we've had trouble with ice build-up that sometimes would not allow parked cars to back out, an item we have had no issues with since the instal- lation of the new pavers. During extremely heavy storm events, we may get water over the curb line, but it quickly works its way into the drainage system and is not a constant occurrence as it was in the past." As part of the stormwater management system, Fort Morgan sweeps all 54 centerline miles of city streets each week with vacuum street sweepers. Taking this diligent approach has successfully main - tained the integrity of the system, including cleaning the permeable pavers without removing any joint aggregate, which could otherwise jeopardize how well the surface allows infiltration. In addition, Fort Morgan is among the leaders of municipalities in Colorado to take the thoughtful foresight to use polyurethane blades rather than steel blades on all of its snow removal equipment. While preserving the city's asphalt and concrete roadways, the polyurethane blades also help to avoid scratching, chipping or otherwise damaging the pavers. Taking this proactive approach in keeping the PICP and other con - ventional surfaces clean, along with the use of colored pavers for the striping of parking spaces will reduce long-term maintenance costs for Fort Morgan. As for the local businesses, the Downtown Infrastructure Project has proved to be a huge success, Jim and Deb Forstedt, owners of Fort Morgan Furniture, no longer have to spend countless hours each winter removing snow and ice while pushing customers' cars from parking spaces. They no longer have to be concerned that a cus- tomer might slip and fall while visiting their store, which has been open since 1946. They no longer have to be concerned that flooding could create impassable streets and prevent customers from shop- ping at their store. In fact, according to the Forstedts, a 45-minute downpour this summer that produced 2½ inches of rain caused no issues and the pavers dried quickly as a result of the new stormwater management system. While no permeability testing on the streets has taken place, visual anecdotal evidence from Curtis shows nearly a 100 percent capture (no run off) in minor storm events. Curtis concludes, "By using a permeable interlocking concrete pavement, downtown Fort Morgan is serving as a perfect pilot project for the city as we further address our storm-water related infrastructure needs." "Although this was mainly an infrastructure project," said city manager Jeff Wells, "efforts enhanced the attractiveness, convenience and functionality of the downtown area while improving pedestrian access and safety." DBM LC Hardscapes (Continued from page 14)

Articles in this issue

Archives of this issue

view archives of Landscape Contractor / Design Build Maintain - NOV 2014